34 projects between 2011 and 2025, all for the public sector in Basra.

public projects delivered
34
Contract value
142.5bn IQD
Roads built and rehabilitated
80+km
Years on record
2011-2025

Projects per year

  1. 6
  2. 4
  3. 9
  4. 9
  5. 4
  6. 1
  7. 1
Projects per year
YearRoads and bridgesMunicipal worksSchools and buildingsElectrical worksOtherTotal
2011321006
2012400004
2013810009
2019243009
2022030014
2023000101
2025000101
  • Roads and bridges17
  • Municipal works10
  • Schools and buildings4
  • Electrical works2
  • Other1

Road length, running total

Road length, running total
YearAdded in the year, kmRunning total, km
20115.85.8
201214.820.6
201353.273.8
201910.183.9
20220.083.9
20230.083.9
20250.083.9

Only projects with a recorded length are counted.

The charts show the whole record. The filters below do not change them.

Field of work

Period

10 of 34 projects

Reset filters

2022

3 projects

  • Works and rehabilitation of Olympic Committee street from Al-Tarbiya junction to Dinar street

    Field: Municipal worksArea: Basra

  • Rehabilitation and development of Casino Lebnan street

    Field: Municipal worksArea: Basra

  • Rehabilitation of Freij Al-Sakhr street from Al-Burhama junction to Al-Qusur gate

    Field: Municipal worksArea: Basra

2019

4 projects

  • Widening of the inner Abu Al-Khaseeb road from Al-Saraji bridge toward Sayyid Amin street

    Field: Municipal worksArea: Abu Al-Khaseeb

  • Widening, rehabilitation and maintenance of vehicle bridges on Abu Al-Khaseeb road

    Field: Municipal worksArea: Abu Al-Khaseeb

  • Construction of Al-Shalha road (phase one)

    Field: Municipal worksArea: Al-Shalha

  • Rehabilitation of the Abu Kosra road entrance

    Field: Municipal worksArea: Abu Kosra

2013

1 project

  • Widening of the Basra-Baghdad expressway and Officers street up to the Industrial checkpoint (Al-Qurna)

    Field: Municipal worksArea: Al-Qurna

2011

2 projects

  • Rehabilitation of the southern entrance to Al-Nashwa sub-district

    Field: Municipal worksArea: Al-Nashwa sub-district

  • Paving of the main street in the centre of Al-Nashwa sub-district

    Field: Municipal worksArea: Al-Nashwa sub-district