Skip to content
An aerial view at dusk of a lit road interchange with looping ramps and a bridge over a river, palm groves and the city beyond

See It, Solve It!

A general contractor delivering public-sector projects in Basra.

  1. 2007

    Founded

  2. 34projects

    For the public sector

  3. 142.5bn IQD

    Contract value

  4. 80+km

    Roads built or upgraded

What we build

Six fields, from roads and bridges to two asphalt plants.

  • 34projects

    for the public sector, 2011 to 2025

  • 142.5bn IQD

    Contract value

  • 80+km

    Roads built or upgraded

  • 2007

    Founded

  • 2asphalt plants

    at Al-Zubair and Al-Qurna

  • 6fields of work

    from roads and bridges to asphalt production

From our record

The latest projects on the record, and how all of them divide by field.

  1. 2025

    Supply, testing and installation of materials to rehabilitate the power-feed sources of Basra International Airport

    Electrical worksBasra International Airport

  2. 2023

    Rehabilitation and development of Casino Lebnan street, with low-voltage and lighting works

    Electrical worksBasra

  3. 2022

    Works and rehabilitation of Olympic Committee street from Al-Tarbiya junction to Dinar street

    Municipal worksBasra

  4. 2022

    Rehabilitation and development of Casino Lebnan street

    Municipal worksBasra

  5. 2022

    Rehabilitation of Freij Al-Sakhr street from Al-Burhama junction to Al-Qusur gate

    Municipal worksBasra

  6. 2022

    Commercial advertising barriers for the Gulf Cup 25 tournament in Basra

    OtherBasra

Projects by field

  • Roads and bridges17
  • Municipal works10
  • Schools and buildings4
  • Electrical works2
  • Other1
Projects by field
FieldTotal
Roads and bridges17
Municipal works10
Schools and buildings4
Electrical works2
Other1

Projects per year

  1. 6
  2. 4
  3. 9
  4. 9
  5. 4
  6. 1
  7. 1
Projects per year
YearRoads and bridgesMunicipal worksSchools and buildingsElectrical worksOtherTotal
2011321006
2012400004
2013810009
2019243009
2022030014
2023000101
2025000101

Two asphalt plants, at Al-Zubair and Al-Qurna

Two computerised batching plants. Incoming materials and the finished mix are tested to Iraqi standards, and measuring and testing equipment is calibrated regularly.

An asphalt mixing plant on a desert site: aggregate bins, a conveyor, the drying drum, the mixing tower, the bitumen tank and a tipper truck
  • Al-Zubair plant

    Computerised batch asphalt plant

  • Al-Qurna plant

    Computerised batch asphalt plant

From aggregate to road
  1. Aggregate bins

  2. Drying drum

  3. Hot elevator and screens

  4. Weighing and mixing with bitumen

  5. Loading the truck

  6. The paved road

Roads and bridgesMunicipal worksSchools and buildingsElectrical worksWater and infrastructureAsphalt production

Who we work with

  • Basra Municipalities Directorate
  • Basra Roads and Bridges Directorate
  • Basra Education Directorate
  • General Company for Electricity Distribution, South
  • All clients

Have a project in Basra?

Send us the scope and the site, and we will come back to you.