34 projects between 2011 and 2025, all for the public sector in Basra.
- public projects delivered
- 34
- Contract value
- 142.5bn IQD
- Roads built and rehabilitated
- 80+km
- Years on record
- 2011-2025
Projects per year
- 6
- 4
- 9
- 9
- 4
- 1
- 1
| Year | Roads and bridges | Municipal works | Schools and buildings | Electrical works | Other | Total |
|---|---|---|---|---|---|---|
| 2011 | 3 | 2 | 1 | 0 | 0 | 6 |
| 2012 | 4 | 0 | 0 | 0 | 0 | 4 |
| 2013 | 8 | 1 | 0 | 0 | 0 | 9 |
| 2019 | 2 | 4 | 3 | 0 | 0 | 9 |
| 2022 | 0 | 3 | 0 | 0 | 1 | 4 |
| 2023 | 0 | 0 | 0 | 1 | 0 | 1 |
| 2025 | 0 | 0 | 0 | 1 | 0 | 1 |
- Roads and bridges17
- Municipal works10
- Schools and buildings4
- Electrical works2
- Other1
Road length, running total
| Year | Added in the year, km | Running total, km |
|---|---|---|
| 2011 | 5.8 | 5.8 |
| 2012 | 14.8 | 20.6 |
| 2013 | 53.2 | 73.8 |
| 2019 | 10.1 | 83.9 |
| 2022 | 0.0 | 83.9 |
| 2023 | 0.0 | 83.9 |
| 2025 | 0.0 | 83.9 |
Only projects with a recorded length are counted.
The charts show the whole record. The filters below do not change them.
Field of work
Period
2 of 34 projects
Reset filters2025
1 project
Supply, testing and installation of materials to rehabilitate the power-feed sources of Basra International Airport
Field: Electrical worksArea: Basra International Airport
Area: Basra International Airport
2023
1 project
Rehabilitation and development of Casino Lebnan street, with low-voltage and lighting works
Field: Electrical worksArea: Basra
Area: Basra